String-Along Lead
String-Along Lead
String-Along Lead
  • Load image into Gallery viewer, String-Along Lead
  • Load image into Gallery viewer, String-Along Lead
  • Load image into Gallery viewer, String-Along Lead

String-Along Lead

Regular price
$18.95
Sale price
$18.95
Regular price
Sold out
Unit price
per 

This versatile lead is approximately 6 ft long. The quick-release panic snap is attached to the front llama's pack or pack saddle, either directly to the crossbuck or rigging somewhere, or with the handy loop provided. The other end is a regular snap that is clipped to the following llama's halter.  The ring that slides along the rope is handy if you need to tie the following llama to a tree - just clip the quick release to the ring.  You can try it different ways to see what works best for your set-up. 
5/8" poly rope.  Red, Black, Blaze Orange  Black poly Loop included.